Concrete Equipment Pads in Gatineau
An equipment pad is a footing for something that runs every day, often with vibration, often with significant weight. Gatineau Concrete pours engineered equipment pads for HVAC units, generators, transformers, tanks, and any commercial site equipment that needs a permanent base. Sized to the equipment's loaded weight, isolated from vibration where required, anchor-bolt embeds set to the equipment's footprint. Every project starts with a free written estimate.
- Sized to equipment loaded weight
- Anchor embeds to footprint
- Free written estimate, firm schedule
Why pads need engineering
What Equipment Pads Have to Get Right
An equipment pad is simple-looking and easy to underbuild. The pad has to support the loaded weight of the equipment (not the dry weight; HVAC units full of water and refrigerant weigh more than their spec sheet), resist the vibration the equipment generates, position anchor bolts so they bolt into the right place on the equipment's mounting frame, and last as long as the equipment cycles do.
We get the equipment spec from you or the equipment supplier, size the pad to the loaded weight (including a margin for service loads), tie the reinforcement to the loads, set the anchor bolts in the form before the pour so they end up in the exact positions the equipment frame expects, and add vibration isolation pads where the equipment's spec calls for them.
Same engineering across our site concrete work and the broader commercial concrete service. Equipment pads often go in during a site renovation alongside loading dock or parking lot work.
How it works
How We Pour an Equipment Pad in Gatineau
-
Get the equipment spec
We get the equipment cut sheet (footprint, loaded weight, vibration class, anchor pattern, any isolation requirements) from you or the supplier, and design the pad to those specs rather than to a generic equipment-pad template.
-
Excavate below frost for the pad
The pad footprint is excavated below frost line where the equipment is exterior, compacted, and a gravel base placed to the engineered depth so the pad does not heave with our winters.
-
Form, reinforce, set anchors
Pad forms are built to the engineered dimensions, rebar tied to spec, anchor bolts positioned with a template that matches the equipment's mounting frame so the bolts land in the right place, and any vibration isolation embeds are placed.
-
Pour, cure, hand off to install
Concrete is placed, finished smooth to the elevation the equipment expects, and protected through cure. The pad is handed off to the equipment installer with as-built dimensions verified and the anchor bolt projection at the right height.
Where pads go wrong
Anchor Position Is What Equipment Installers Care About
An equipment installer arriving on site with a unit that needs to bolt into anchor bolts that are out of position has a bad day. Most equipment-pad disputes are over anchor bolt position, the pad was poured but the bolts ended up half an inch off the equipment frame. We template every anchor pattern from the equipment cut sheet and verify position during the pour, not after.
Coordinate with the equipment supplier on every project so the cut sheet drives the pad design. Equipment pads also often pair with parking lot or loading dock work where the pad is part of a larger site project, and we sequence the work accordingly.
Other site concrete services
Compare with Other Site Concrete Services
Equipment pads is one of four site concrete services we offer. See the rest.
Loading Dock Construction & Repair
Engineered loading-dock slabs and aprons sloped to the pit, built to bear truck loads.
Learn moreCommercial Sidewalks
Code-spec commercial walks for property edges, public connections and ADA paths.
Learn moreADA Ramps & Curb Cuts
ADA-compliant ramps, curb cuts and tactile surfaces for accessible site design.
Learn moreCommon questions
Equipment Pad Questions, Answered
Anchor patterns, vibration isolation, sizing to loaded weight and equipment-installer coordination.
HVAC pad with anchor bolts that lined up exactly with the unit frame. The HVAC installer commented that it was the easiest install he had done that month. Templating is everything.
Generator pad engineered for the unit's vibration and weight. Three years of regular generator runs, zero crack development, zero shift. The engineering held.
Transformer pad replacement during a planned outage. Coordinated the schedule tightly with the utility, pad cured and ready in the window. Power back on as scheduled. Real timing discipline.
Multiple equipment pads across a plant expansion. Every cut sheet honored, every anchor template right, every pad finished to the elevation the equipment expected. No improvisation, no surprises.
From the blog
Concrete Guides & Articles
Practical reading on planning, finishes and caring for concrete in Gatineau.
Ready to start
Get a Free Equipment Pad Quote
Send us the equipment cut sheet (or the unit specs) and the install location, and we will design and quote the pad in writing.
We'll assess on-site and send a written quote within one business day.