Driveways & Patios
Floors & Foundations
Floors & Flatwork
Sites & Facilities
Floors & Coatings
Facilities We Serve
Aircraft Hangars · Aprons & Taxiways
Aircraft Apron & Taxiway Concrete Built for Gatineau
Aprons and taxiway sections take aircraft weight, jet engine heat and chemical exposure, then freeze and thaw through Quebec winters. Gatineau Concrete sizes the slab, reinforces the joints, and seals the surface to handle all three. Every project is engineered to the actual aircraft fleet, poured with a freeze-thaw mix, and quoted in writing before work starts.
- Engineered to aircraft load
- Freeze-thaw concrete mix
- Free written estimate, firm schedule
Site conditions
Why Aircraft Aprons Demand Engineered Concrete
An apron is not a parking lot. The slab must carry concentrated gear loads from aircraft that can weigh hundreds of thousands of pounds, with the load concentrated on a few small contact patches. That load profile drives the thickness, the reinforcement pattern, and the joint spacing. Skip the engineering and the slab will fail at the joints within a few seasons.
Add Quebec winters and jet fuel exposure, and the concrete itself must be mixed differently. Air entrainment in the mix design lets water freeze inside the concrete matrix without spalling the surface. The sealer must resist jet fuel, de-icing fluid, and thermal shock from engine run-up zones. We specify all three from the start: the slab thickness from the aircraft load, the mix design from the freeze-thaw exposure, and the sealer from the chemical environment.
See our broader aircraft hangar concrete work, including hangar floor epoxy systems and site concrete across the facility.
The sequence
How Apron Concrete Gets Poured in Gatineau
-
Measure and engineer the load
We start with the aircraft specs: weight, gear configuration, and the heaviest aircraft that will use the apron. The engineer calculates slab thickness, reinforcement, and joint pattern from that load profile.
-
Prepare the subgrade and base
The apron footprint is excavated to the engineered subgrade depth, compacted in lifts, and the gravel base is placed and compacted again. Grade is verified for proper drainage before forming begins.
-
Form, reinforce, and pour the slab
Forms are set to the engineered joint pattern, load-transfer dowels are placed where the design calls for them, and the freeze-thaw-rated concrete mix is poured, screeded, and finished to the specified surface.
-
Saw, seal, and cure
Control joints are saw-cut on schedule, sealed with aviation-rated joint sealant, and the surface is sealed against jet fuel and de-icing fluid. The slab cures under controlled conditions before aircraft operations resume.
Common failure modes
Joint Failure and Pooling Water Are the Apron Killers
We see two patterns in failed aprons: joints that were sealed with the wrong material or not sealed at all, and drainage that lets water pool on the surface. Both lead to spalling and scaling within a few winters as water freezes in the concrete and breaks it apart from the inside.
Our approach is to engineer drainage into the apron from day one, with slopes that shed water to low points and perimeter drains where needed. Joints are sealed with aviation-rated sealant that resists jet fuel, de-icing fluid, and the freeze-thaw cycle. We also coordinate with adjacent concrete supply and concrete pumping services to ensure the whole site concrete system works together.
Related aircraft services
Other Hangar Concrete Services We Offer
Aprons is one part of our aircraft hangar work. Explore the full range.
Common questions
Hangar Apron Questions, Answered
Slab thickness, joint pattern, jet blast and freeze-thaw mix design.
New apron poured to engineering for our heaviest based aircraft. Joints dowelled, sealed properly, freeze-thaw mix verified. Three winters in, zero surface scaling, zero joint failure.
They knew the aviation specs cold, coordinated with our engineer on slab thickness and joint pattern. The result has held through heavy aircraft turn and full winter cycling.
Apron expansion to handle a new based aircraft. Engineered specifically for the new load, tied into existing pavement cleanly. The transition joint has held perfectly.
Apron with engine run-up area required jet-blast-rated sealer. They specified the right product, applied to spec, the surface has held with no erosion at the run-up zone.
From the blog
Concrete Guides & Articles
Practical reading on planning, finishes and caring for concrete in Gatineau.
Ready to start
Get a Free Apron Estimate
Tell us the aircraft fleet, the apron area, and any tie-in to existing pavement, and we will engineer the slab and quote in writing.
We'll assess on-site and send a written quote within one business day.