Particle-Verified Clean Room Concrete Flooring for Gatineau

ISO clean rooms live or fail on particle count. The floor is part of that budget. Gatineau Concrete installs seamless epoxy and urethane systems engineered to stay below your facility's particle threshold, with verified low off-gas chemistry and grounding where ESD control matters. Free written estimate, firm schedule.

  • Particle count verified post-install
  • ESD grounding where required
  • Free written estimate, firm schedule

The particle problem

Why Seamless Concrete Flooring Matters in Clean Rooms

Every ISO clean room operates within a particle budget. The air handling system removes particles, but the floor itself is a source. Standard concrete sheds dust and fibers under foot traffic and equipment movement. A sealed seamless floor system holds those particles in place, keeping them out of the air and off sensitive surfaces.

We specify the epoxy or urethane chemistry matched to your ISO class and process requirements, with low off-gas ratings verified by the material manufacturer. The slab is prepped using contained or HEPA-filtered methods to avoid cross-contamination, and every transition (wall, door, pipe penetration) is sealed with seamless cove so the floor's integrity holds at the room boundary.

Our ESD flooring work in adjacent non-clean zones coordinates with the clean room slab. We also handle EV battery production flooring in the broader facility, and cold storage floor systems where temperature control meets clean-room specs.

Recent work
seamless clean room concrete floor in a Gatineau sealed-process facility
particle verification testing on a finished clean room floor

Installation sequence

How We Build Clean Room Concrete Floors in Gatineau

  1. Determine ISO class and material spec

    We identify the target ISO class, the particle contribution budget the floor must meet, any ESD or grounding requirements, and the off-gas chemistry limits for your process. Material selection is locked to the class.

  2. Prepare slab in controlled conditions

    The concrete slab is prepped using HEPA-filtered or sealed-prep methods to prevent contamination of adjacent spaces. Surface is ground to the system profile, cracks repaired with clean-room-rated materials, and moisture tested.

  3. Apply seamless epoxy or urethane

    The matched seamless system is applied without joints or seams across the room footprint. Topcoat is selected for the particle-shed and off-gas specs your facility requires.

  4. Verify particle and ESD performance

    After cure, particle count testing confirms the floor meets your budget. ESD resistance is verified where required. Certification documentation is delivered for your clean room commissioning file.

Critical detail

Room Boundaries: Where Clean Room Floors Fail

A perfect seamless floor across the room footprint can fail at the edges. The wall-floor junction, the door frame, the pipe or cable penetration, the transition to a non-clean adjacent space. These are where particles escape and where the room's ISO rating breaks. We detail every boundary with seamless cove base, sealed penetrations, and integrated door frames so the floor's clean integrity extends to the room perimeter.

Coordinate with chemical-resistant flooring in adjacent production zones and with warehouse floor systems in non-clean storage areas that share the facility.

Quote a clean room floor
finished clean room floor with ISO-class verification documentation
Seamless Across room
Verified Particle + ESD
Free Written estimate

Related EV battery services

Explore Other EV Battery Flooring Options

Clean room is one of two EV battery floor systems we install. See the other.

All EV battery services

Common questions

Clean Room Floor Questions, Answered

ISO class, particle budget, off-gas chemistry and transition details.

Multiple classes from less strict to more strict, with the floor system spec matched to the class. We confirm the target class up front and select the matched system; higher classes require lower-particulate materials and stricter install discipline.
Yes, significantly. A standard floor sheds particles continuously; a properly specified clean-room floor contributes far less. In an ISO-rated environment, every surface counts toward the particle budget.
Floor systems can off-gas trace chemistry that contaminates sensitive processes. We use chemistry rated for low off-gas in clean room applications, verified by the manufacturer for your specific class requirement.
Yes, transitions are where most clean room floors fail. We detail every transition (wall, door, penetration) with seamless cove and sealed integration so the floor's clean integrity holds at the room boundary.
Per room, typically a week or more depending on size and ISO class. The cure window before clean room commissioning adds additional time. The full schedule is in the quote and built around your commissioning calendar.

Client reviews

What Gatineau Operations Say About Their Clean Room Floors

★★★★★ 4.9 · 87 reviews on Google
Read all reviews →
★★★★★

ISO-class verified at commissioning with our floor as part of the particle budget. Hit class, room ran first try. The seamless transition detail at the door made the difference.

Z. J5
Clean Room Operations, Gatineau
★★★★★

Off-gas verification on the floor chemistry for our sensitive process. No detectable contamination at the production analytical limit. Spec matched the process requirement exactly.

Y. J5
Process Engineer, Ottawa
★★★★★

Multiple clean rooms across our facility, each at different ISO classes. They specced per room rather than one system everywhere; class targets hit in every room first commissioning.

Q. J5
Facility Engineer, Barrhaven
★★★★★

Documentation package supported the validation file. Material specs, install method, particle verification all included. Auditor signed off without revisions.

X. J5
Validation Lead, Nepean

Ready to start

Get a Free Clean Room Floor Quote

Provide the ISO class, room dimensions, and your commissioning timeline, and we will specify the matched system and deliver a written quote.

We'll assess the clean room and send a written quote within one business day.