Driveways & Patios
Floors & Foundations
Floors & Flatwork
Sites & Facilities
Floors & Coatings
Facilities We Serve
Manufacturing · ESD
Static-Dissipative ESD Flooring for Gatineau
A single static spark can destroy sensitive electronics mid-assembly. When your manufacturing floor handles components vulnerable to electrostatic discharge, the concrete slab itself becomes part of your protection strategy. Gatineau Concrete installs dissipative flooring systems engineered to bleed static charge safely to ground, with megohmmeter verification confirming the resistance range meets your ANSI/ESD standard. Free written estimate included.
- Megohmmeter verified
- Grounded to building electrical
- Free written estimate, firm schedule
The ESD specification
Why Static-Dissipative Flooring Sits in the Middle
ESD flooring is not simply conductive or insulating. It must occupy a narrow dissipative window where static charge flows to ground at a controlled rate. Too conductive and you risk electrical hazards; too insulating and charge accumulates faster than it can escape. The dissipative range is the safe zone.
We install epoxy systems with conductive elements (carbon black, conductive aggregate) loaded to hit your facility's target resistance range, then verify the finished slab across multiple points with a megohmmeter. Copper ground strips embedded in the concrete connect to the building electrical ground at engineered intervals. The result is a floor that actively protects your assembly line.
This approach integrates with our broader heavy-duty manufacturing floors and chemical-resistant epoxy systems. For clean room applications with stricter ESD specs, see our EV battery clean room flooring.
Installation sequence
How ESD Flooring Gets Installed in Gatineau
-
Define the ESD standard and zones
We work with your engineering and safety teams to confirm which ANSI/ESD standard governs your facility, identify which zones require dissipative flooring, and establish the target resistance range and grounding scheme.
-
Prepare slab and set ground strips
The concrete slab is diamond-ground to the system profile. Copper ground strips are installed at the engineered spacing and connected to the building electrical ground at designated points per the electrical contractor's coordination.
-
Apply dissipative epoxy system
The matched ESD epoxy is applied from primer through topcoat, with conductive fillers at the precise loading to land the finished floor in your target resistance range.
-
Test and document resistance
After full cure, the floor is tested at multiple points with a megohmmeter. Resistance readings are documented for each zone and provided to your facility for compliance audits and future recertification.
The critical step
Megohmmeter Testing Proves the System Works
An ESD floor that looks correct but fails resistance testing is worse than useless. It creates a false sense of protection while components remain at risk. Megohmmeter verification at multiple points across the finished slab is the only way to confirm the dissipative system is actually performing. We never hand off an ESD floor without documented resistance readings.
Coordinate the install with your electrical contractor on the building ground scheme and with adjacent dust-proof sealing or warehouse flooring in non-ESD zones. Each system is detailed to work cleanly in its zone, part of our integrated manufacturing concrete approach.
Related manufacturing services
ESD Flooring Pairs With Other Manufacturing Systems
ESD is one of four specialized manufacturing floor options. See the alternatives.
Heavy-Duty Concrete Floors
High-strength manufacturing floor systems engineered for heavy equipment and impact.
Learn moreChemical-Resistant Flooring
Urethane and specialty epoxy systems rated for industrial chemical exposure.
Learn moreDust-Proof Concrete Sealing
Densifier and sealer systems that lock down concrete dust for cleaner facilities.
Learn moreCommon questions
ESD Flooring Questions, Answered
Resistance ranges, grounding, verification and which manufacturing zones need ESD.
ESD floor installed and verified across our assembly zone. Resistance documentation supported our customer compliance audit. The system has held for two years of daily operation.
They knew the ANSI/ESD spec cold, coordinated with our electrical contractor on grounding, verified with the megohmmeter at handoff. No improvisation, no audit findings.
Stricter clean room ESD spec, they hit it. Documentation, grounding, verification all in order. The auditor specifically called out the install quality.
Phased ESD install during off-shifts so production never stopped. Each zone verified before reopening, no resistance drift between zones. Real coordination.
From the blog
Concrete Guides & Articles
Practical reading on planning, finishes and caring for concrete in Gatineau.
Ready to start
Get a Free ESD Flooring Quote
Share your ANSI/ESD standard, the zones requiring coverage, and your operating schedule. We will spec the dissipative system, ground it to your building electrical, and quote the install with megohmmeter verification documentation.
We'll assess the facility and send a written quote within one business day.